It's in. The easy part was wiring the new ceramic core and making a plate for it to sit in... The hard part was replacing all the rotted foam in the poor old thing. It looked/felt like it had been doused in gas - all the foam would come apart at the slightest touch.
I replaced all the foam with adhesive backed foam strips used to hold truck caps down with. Perhaps not going to pass concours, but good enough for me.
Monday, August 11, 2008
Thursday, August 7, 2008
Back From Camping
So many components showed up while I was gone...
Vacuum Pump, Potbox, Circuit Breaker, Fuses, Gauges, Shunt, Battery Pads, Heater Core...
I don't know where to begin, so I'm first going to build the box to put it all in...!
Vacuum Pump, Potbox, Circuit Breaker, Fuses, Gauges, Shunt, Battery Pads, Heater Core...
I don't know where to begin, so I'm first going to build the box to put it all in...!
Sunday, July 27, 2008
Getting ready for the heater
Wednesday, July 23, 2008
Final Battery Box is in...
Saturday, July 19, 2008
Rear diff is full, driveshaft is in place
Filled up the rear differential - no oil at all left in it after a 20 year hiatus...
The driveshaft is in - now all I have to do is get the controller, etc. hooked up...
The driveshaft is in - now all I have to do is get the controller, etc. hooked up...
Friday, July 18, 2008
Engine Is In and Tied Down!
Thursday, July 17, 2008
Engine and Tranny installation, Part 1
Subscribe to:
Posts (Atom)